Active Directory Series

🎓 The Active Directory Department's Capstone Project: Turning an Acquisition-Integration Scenario Into a Portfolio Piece, a "Top 1%" Integrative Exercise

Introduction

This article is part of the Top 1% Series Complete Article Guide. It’s positioned as the capstone project within the Active Directory Department’s full curriculum.

Prerequisite Knowledge

This hands-on doesn’t teach any new technique. You’ll combine and use the techniques you’ve already mastered in the following completed hands-on labs.

The Assignment: a Fictional Corporate Acquisition Scenario

You’re an infrastructure engineer at a fictional company, “Contoso.” Contoso has just acquired another fictional company, “Fabrikam.” Your assignment is to build, on your own, an integrated AD environment that satisfies all of the following requirements.

graph TB
    subgraph Contoso["Contoso (the acquirer) forest"]
        ContosoDC["contoso.local"]
    end
    subgraph Fabrikam["Fabrikam (the acquired company) forest"]
        FabrikamDC["fabrikam.local"]
    end
    ContosoDC <-->|"Forest trust"| FabrikamDC
    FabrikamDC --> HelpdeskOU["Fabrikam Help Desk OU<br/>(delegation configured)"]
    FabrikamDC --> ServiceOU["Fabrikam Service Account OU<br/>(migrated to gMSA)"]

Requirement 1: Build a Forest Trust

Contoso and Fabrikam will keep operating as separate forests for now. Build a forest trust so employees at both companies can access each other’s resources.

Requirement 2: Apply a Unified Security Policy to Fabrikam’s Side

To align with Contoso’s security standards, design and apply a GPO that unifies password policy, lock-screen settings, and similar for Fabrikam’s users.

Requirement 3: Delegate Only Limited Rights to Fabrikam’s Help Desk Team

Fabrikam’s existing help desk team stays in place. Without granting Domain Admins rights, delegate only the rights actually needed for help desk work, such as password resets, to the relevant OU.

Requirement 4: Migrate Fabrikam’s Legacy Service Accounts to gMSA

Investigation reveals several of Fabrikam’s services have been running on service accounts with fixed passwords managed by a human. Migrate these to gMSA, eliminating the password-management burden and leak risk.

Requirement 5: Establish a Backup Regimen

In case something goes wrong during the integration work, establish a System State backup regimen for Fabrikam’s DCs, and verify you can actually restore from it.

Requirement 6: Perform a Security Audit

To confirm whether Fabrikam’s pre-integration environment meets Contoso’s security bar, audit Fabrikam’s AD environment from a Kerberoasting and DCSync perspective, and report whatever issues you find along with your recommended fixes.

Deliverable Requirements: Assemble It as a Portfolio

This hands-on’s final deliverable isn’t just screenshots of things working, or PowerShell output. Put together a repository, on GitHub or similar, containing:

This deliverable itself is a concrete accomplishment you can present in a job search or as a portfolio piece. Being able to show “I designed a solution combining multiple techniques under the realistic constraints of an acquisition integration, and can articulate my reasoning” is far more persuasive than simply saying “I did the Kerberoasting hands-on.”

What a Pro Sees Here (Top 1% Understanding)

“Following Steps” and “Designing From Requirements” Are Entirely Different Skills

Every earlier hands-on in this series took the form of “Step 1, Step 2, …” — following a fixed, predetermined sequence. But what actually gets valued in real-world work isn’t the ability to execute a procedure exactly as written — it’s the ability to look at given requirements (Requirements 1 through 6 in this article) and design, yourself, which techniques to use, in what order, and how to combine them. These are similar-looking but entirely different skills. Completing every individual hands-on doesn’t make you immediately effective in real work if you’ve never designed one coherent environment combining them. This capstone project is deliberately designed to bridge exactly that gap.

Why a “Fictional Corporate Acquisition” Setting?

There’s a reason this hands-on deliberately models a multi-year, realistic project — an acquisition integration — instead of a single-shot technical demo. Most real-world AD projects never wrap up with a single technology rollout — they involve multiple goals tangled together at once: organizational integration, security hardening, and operational handover. Knowing forest trust alone doesn’t help in a real project if you can’t also see ahead to GPO unification, delegation, and a security audit. The ultimate goal of this capstone is elevating your knowledge of individual techniques into the design ability to see an entire project.

Common Misconceptions and Pitfalls

Troubleshooting Perspective

This hands-on’s main challenge isn’t individual technical troubleshooting — it’s design rework.

  1. You thought you satisfied the requirements, but notice a contradiction later: Before starting implementation, write out only the design section of README.md first, and confirm on paper that all six requirements are genuinely satisfied.
  2. You’ve forgotten the steps for an individual hands-on: Don’t hesitate to go back and re-read the prerequisite article for that requirement. This capstone tests design ability, not memorization.
  3. You’re not sure how thorough to make this: Use “could I show this README.md to an interviewer I’ve never met and explain my design decisions” as your bar for completeness.

Summary

Takeaways to Apply Today

  1. Even while learning individual hands-on labs, build the habit of asking “under what future requirements would I actually use this?”
  2. Beyond the technical deliverable itself, build the habit of articulating your reasoning in your day-to-day work too.

References

Comments

Feel free to leave thoughts, questions, or corrections below (sign in with a GitHub account to comment or react).